Mark any concrete bumps that are raised above the rest of the floor with an x and any dips that are lower than the floor with an o.
Cutting door into lower level floor.
Remove any old door and molding such as a casing or bottom threshold inside the opening.
In these situations lots of builders take the approach you mention.
If you decide to cut off an exterior door make sure you have a plan for sealing the bottom of the door against the threshold when the door is closed.
Before taking steps to level a floor you must find out why it s not level.
Hold a 16 inch long two by four block of wood vertical 4 to 5 feet up and centered in the doorway that will be cut out.
You will have to make sure your joists can handle the addition of considerably more weight from the plywood subfloor and any floor coverings.
Strip the frame down to the side 2 by 4 inch studs top header plate and floor or subfloor.
Determine the underlying problem.
Check the marks with a 4 foot level to ensure the lines are plumb and level.
Raise the lower end of the level until the bubble is centered then measure the distance from the bottom of the level to the floor to find the depth of the dip.
Many new homes are built with lower profile joists to achieve this effect but that doesn t help much when it comes to remodels.
Drill two or three holes through the wood and into the foundation material with a hammer drill and a 1 4 inch diameter masonry bit.
On the top side of the floor another fix it idea to lay down new hardwood over the existing floor.
Leveling a floor can be either a do it yourself project or a job for the pros.
Glenn mathewson a code official in westminster colo responds.
A plywood subfloor will bridge any minor waves in the existing floor and leveling compound would help too.
Use a piece of chalk to mark all obvious high and low spots on the floor.
Lay a long level downhill on the floor with one end of the level on the level part of the floor and the other end at the lowest point.